top of page

Klang Valley Mass Rapid Transit Serdang - Sungai Buluh - Putrajaya Line (KVMRT) Line 2 Project

ddc7_2.jpg

Project Location

Kuala Lumpur, Malaysia

Client

AECOM Perunding Sdn Bhd

Services Period

From March 2017 

to 2022 (on-going)

Type of Services

Detailed Design and Construction Supervision

Project Overview

The Project entails the DDC7 Civil and Structural Design Services which is one of seven detailed design packages for the Underground Works section of the Klang Valley Mass Rapid Transit Serdang - Sungai Buluh -  Putrajaya Line (known as KVMRT Line 2) in Kuala Lumpur.

 

It consists of three underground stations, namely Conlay Station, Chan Sow Lin Station, as well as alteration and additional works to Tun Razak Exchange Station.

CECI's role as designer involves the following types of activities:

  • Structural Engineering Design including foundation design;

  • Geotechnical Engineering Design;

  • Additional and alternation works to the existing railway station and its facilities (links and systems);

  • Infrastructure works in relation to or connected to the stations including earthworks, road works, drainage works, utility diversions, traffic diversions and management, walkways, substations and pedestrian bridges;

  • Coordination with other detailed design consultants;

  • Construction supervision;

  • Other activities, such as, Building Information Modelling (BIM), Risk Management, Interface Management, Value Engineering, etc.

Malaysia

malayflag2.jpg

Population: 31.8 Million

Total Area: 330,000 sq. km.

Malaysia's economy has been steadily growing over the years and is now the 4th largest in Southeast Asia after Indonesia, Thailand and Singapore. CECI recently established subsidiary and representative offices in Malaysia where continued development of a massive and comprehensive transport network keeps pace with the growing economy.

bottom of page