Cisumdawu Toll Road (Phase II) Project

Project Location

West Java Province

Client

Ministry of Public Works and Housing (MPWH)

Services Period

From September 2016

to 2020 (on-going)

Type of Services

Construction Supervision

Project Overview

The Project scope is the supervision of construction of the Cisumdawu Freeway (Toll Road) Project Phase II, including:

 

  • 10.7 Kilometers length of Main Road with Tunnel construction (± 500 meters),

  • Access Roads of Rancakalong Interchange (± 1100 meters),

  • Access Roads of Sumedang Interchange (length± 1000 meters) and

  • 2 bridges (total length ± 970 meters).

 

The Consultant Team performs technical supervision of the construction in the field according to the standards and criteria for the road / bridge / tunnel undertaken by the contractors.

 

Typical duties and services being provided include:

  • Reviewing and approving the Contractor’s working drawings;

  • Reviewing the work schedule and progress;

  • Evaluating the suitability of all project inputs;

  • Inspecting and evaluating installations;

  • Verifying the survey data;

  • Implementing effective and control of the quality of the carried-out work; and

  • Revising the design, if there is a discrepancy with the field conditions.

More Projects

CECI ENGINEERING CONSULTANTS, INC., TAIWAN

No. 323 Yangguang Street, Neihu District, 

Taipei City, 11491, TAIWAN

Tel: +886-2-87973567 Ext. 8310

Email: ob@ceci.com.tw

© 2019 CECI all rights reserved.